Incinerator Operating period Anticipated daily period 8 hours

Operating period Anticipated daily period 8 hours Maximum operating period 12hours Chamber Should be refractory lined to the following standards, hearth and lower section of chamber walls. Hot face materials Super dusty firebricks Limiting continuous service limit 1500°c Thickness 100mm Thermal conductivity 1.3W/mk Insulation Calcium silicate Limiting continuous service limit 1000°c Thickness 25mm Thermal conductivity 0.095w/mk Chimney/stack Should be manufactured from refractory lined mild steel or high quality air cooled stainless steel. The chimney/stack should have a minimum height of 10 meters above ground level Ignition burners Fully packed oil type complete with electric ignition and flame failure controls wired with continuous running fan and complete with all valves, fan and motor Maximum rating :               at least 450kw/hour Burner:                                  arranged for on/off operation Maximum consumption :   at least 6litres per hour Average consumption :      at least 3litres/hour After burner Fully packed oil type complete with electric ignition and flame failure controls wired with continuous running fan and complete with all valves fan and motor....

Read More

Medical Incineraotors chamber of post combustion

1.A chamber of post combustion of gases A burner of combustion of gases, A device of injection of air allowing a total re-combustion of gases, A device of air inlet of cooling of waste gases, A sheath of evacuation of the gases burnt, Carcass in strong sheet steel with support of connection Composition of the refractory; Refractory concrete: Thickness :>150mm Nature: 65%% of Al203 Insulate in fibrous panels: Thickness: >85mm Nature: Calcium Burner with fuel, mono-bloc casting guiding type with horizontal flame, lighting and safety of electronic ignition, permanent ventilation,  electromagnetic sluice gate of regulation and isolating valve. A secondary injection of air to ensure perfect oxygen content. 2.A control box ensuring the complete cycle of combustion. 3.Fan: Electro-ventilator distributing the secondary air, the regulation of the air flow being carried out by valves and following the control of  the automatic cycle. 4.Controls and regulations: Control box watertight to dust, including: A switch circuit breaker for each engine (ventilators and burners). A timer with adjustable temporization for the regulation of each burner. A regulator with digital watching for the temperature of combustion....

Read More

Medical Incineraotors chamber of post combustion

1.A chamber of post combustion of gases A burner of combustion of gases, A device of injection of air allowing a total re-combustion of gases, A device of air inlet of cooling of waste gases, A sheath of evacuation of the gases burnt, Carcass in strong sheet steel with support of connection Composition of the refractory; Refractory concrete: Thickness :>150mm Nature: 65%% of Al203 Insulate in fibrous panels: Thickness: >85mm Nature: Calcium Burner with fuel, mono-bloc casting guiding type with horizontal flame, lighting and safety of electronic ignition, permanent ventilation,  electromagnetic sluice gate of regulation and isolating valve. A secondary injection of air to ensure perfect oxygen content. 2.A control box ensuring the complete cycle of combustion. 3.Fan: Electro-ventilator distributing the secondary air, the regulation of the air flow being carried out by valves and following the control of  the automatic cycle. 4.Controls and regulations: Control box watertight to dust, including: A switch circuit breaker for each engine (ventilators and burners). A timer with adjustable temporization for the regulation of each burner. A regulator with digital watching for the temperature of combustion....

Read More

hospital incinerator

Principle of the hospital incinerator equipment is incineration/combustion/burn. Generally, the function is waste treatment for Solid waste, Liquid waste, Gas waste, etc.The main body is...

Read More

large animal incinerators

Animal diseases, new virus strains and spread of infectious diseases are only few of the consequences of improper animal waste treatment. Incineration is the way...

Read More